Graham Construction partnered with The Graham Group to construct a 600,000 square foot general commodity warehouse for XPO Logistics in
-
date: 20 Jul 2023
Electrical Power Products
August 2020 – May 2021
Warehouse addition of precast concrete panels and structural metal steel. Interior includes restrooms and offices in a mezzanine area above. Parking lot expansion to the north of the existing lot. One dock with 2 exterior overhead doors. 3 large door openings were cut into existing exterior precast for connection to the addition.