December 2016 - April 2017 (Early Completion) 1, 161 SF Graham Construction recently completed work with Basil Prosperi and Substance
-
date: 02 Nov 2018
-
client: LightEdge Tenant Improvements
-
location: Des Moines, IA
LightEdge Tenant Improvements
January 2018 – April 2018
17, 825 SF
Looking at projects from a client’s point of view is a core part of the Graham Mentality and Graham Construction. When we partnered with LightEdge for their tenant outfit, we worked on an aggressive three-and-a-half-month schedule to meet their needs. In equipping the 17,825 square-foot space for their needs, all the mechanical, electrical, and plumbing elements were designed and built by Graham Construction. The building itself also utilizes a walker duct system, in which the electrical and wiring are under the floor to maximize flexibility for design when working within spaces.
Graham Construction originally built the 909 Locust Street location and was well acquainted with the layout and overall design flow of the building, allowing LightEdge’s space on the third floor to tie in seamlessly with the rest of the building.